What's Required

Fw: Small 2-4 Ton O.H. Hoist

I am located in Ohio.  In the near future I plan on installing a 2-4 ton overhead hoist, on a trolley that will operate on an approx. 65 foot runway.  I would like to know exactly what I need to do to insure that (after installation and prior to commissioning) this machine will fully satisfy all ANSI/OSHA requirements.
 
Thank You          Mike Marchand

 

What did you think of this article?




Trackbacks
  • No trackbacks exist for this post.
Comments
Page: 1 of 1
  • 10/13/2008 6:09 AM Richard wrote:
    Mike

    Before putting the equipment into service you are required to have the equipment under go an inspection and proof test. To find a inspector in your area go to the CCAA home page and click on find an expert link. .
    Reply to this
  • 10/13/2009 6:10 PM Jeff wrote:
    Where can you get sample questions for the ccp test to help study?
    Reply to this

Page: 1 of 1
Leave a comment

Submitted comments are subject to moderation before being displayed.

 Enter the above security code (required)

 Name (required)

 Email (will not be published) (required)

 Website

Your comment is 0 characters limited to 3000 characters.